The metal studs are up, and the trades are starting to fill the walls. There is a lot of copper pipe and conduit. Wood is placed between studs in places where we will hang items from the wall. There's a lot of this - from cabinets to x-ray viewers.
But you can also start to see how open the clinic will be. A large window enables the veterinarians to see the treatment room while at their desk conducting calls to clients.
Here, the contractors are building the walls for the dog ward. We're using concrete blocks for sound dampening.
No comments:
Post a Comment